On 14 April, Eurofound published the eighth edition of the European Working Conditions Survey. It runs on 36,644 face to face interviews across 35 countries, each lasting about 45 minutes, and it has been tracking the same questions for more than three decades.
The survey assesses job quality across seven dimensions: earnings, prospects, skills and discretion, working time, work intensity, the social environment and the physical environment.
Over the last 15 years, five of those seven have improved. Work intensity is one of the two that has not.
Set that against what happened to the working day over a comparable stretch. The share of workers putting in more than ten hours on a given day at least once a month fell from 35 per cent in 2005 to 28 per cent in 2024. The share working 48 hours or more a week nearly halved, from 20 per cent to 11 per cent.
The hours came down. What is inside them did not get lighter.
What the two trends describe together
The obvious reading is that working life is getting better and the intensity figure is a lagging exception. The more useful reading is that the two numbers are describing the same event from opposite ends.
Working time quality improved because the container was made smaller. Fewer very long days, fewer very long weeks, fewer people using their own time to deal with work demands, which fell from 31 per cent in 2010 to 20 per cent in 2024.
Work intensity did not improve because nothing changed about what the container was expected to hold.
The index also moved in opposite directions by gender. Intensity improved for men over the period and deteriorated for women, and in 2024 it was women reporting the higher levels. The aggregate flatness is two trends cancelling, not one population standing still.
Eurofound measures intensity through quantitative demands, which include working to tight deadlines, working at high speed, and whether a person has enough time to get the job done. It also counts pace determinants: the number of separate things that set the speed at which someone works. Having three or more of them is most common in industry, where the main determinant is the speed of automatic systems, and it is also high in financial services, commerce and hospitality.
That is the useful measurement, and it is worth pausing on why. The number of things setting your pace is a fact about the job. It is not a fact about you.
The explanation the market offers
A professional working inside a compressed schedule is handed a very short diagnosis.
You are slow. You should be able to absorb this. Other people are getting through the same list.
The misattribution here is more corrosive than the one attached to overload, because it is harder to argue with. Volume is at least visible. A schedule that does not fit is invisible by design, because the only evidence of the mismatch is the person failing to meet it.
So the reader concludes that the estimate was reasonable and they were not. In most cases the estimate was made before anyone knew what the work involved, by someone who was not going to do it.
The conditions that produce it
The structural circumstances that generate deadline pressure are describable, and none of them is a fact about the person carrying it.
Deadlines set without accounting for the volume or the complexity of what is already committed. Dates promised externally before the work has been scoped. Plans built on best case estimates, so any setback consumes the schedule rather than being absorbed by it.
Multiple deliverables landing on the same timeframe, creating simultaneous urgency across unrelated tasks. Unexpected work arriving and competing directly with dates that were already fixed. Requests coming in faster than they can be sequenced and completed.
No buffer between tasks, so an overrun in one immediately pressurises everything after it. And urgency as the default marking on incoming work, which removes the only signal that would let anyone tell genuine priority from habit.
Read that list again and notice what is absent. Every item is a decision about time, taken by someone, usually before the work was understood.
What tends to relieve it, and where it has to happen
The conditions associated with relief are structural, and most of them sit upstream of the person under pressure.
What eases deadline pressure is a point at which what is already in flight is set out before a new date is agreed, so the date is set with the full picture rather than against an empty diary. Scoping that happens before commitment rather than after it, so any gap between the date and the work is known early enough to matter. Planning based on what the work has actually taken before, rather than on the version where nothing goes wrong.
Sequencing high priority deliverables rather than running them in parallel belongs in the same category, as does buffer built between deliverables so that overruns stop rather than cascade. A route for renegotiating a timeline when conditions change, agreed before the pressure arrives rather than improvised during it. And the question of which item is genuinely first, asked at the point where everything arrives marked urgent.
Some of these sit within reach of the person holding the deadline. Sequencing rather than running things together, leaving buffer between deliverables, planning against what the work has actually taken before: these describe conditions a person can produce inside the room they already have.
The rest do not. Setting out what is in flight before a date is agreed, scoping before the commitment is made, having a renegotiation route that exists in advance: each of these requires the person who sets the date to be part of the arrangement. That is where the line actually falls, and it is not where the advice usually assumes.
That authority has been moving the wrong way. The same survey found that workers' ability to influence collective work processes, their involvement in measures to improve how work is organised, and their ability to apply their own ideas at work have all decreased, for both men and women.
What a leader sees, and what nobody measures
The two ends of this condition look nothing like each other, and that is the whole point.
The professional sees one schedule. Their own dates, their own overruns, their own sense that the estimate was fine and they were not. What they cannot see is whether the same compression sits on everyone, whether the last four projects also ran over, or whether the date they are working to was ever compared with anything.
A leader can see that, in principle. They are the only party in a position to ask whether deadlines are being set with genuine account of complexity and existing commitments, whether the work is being scoped before the date goes out, and whether the plan rests on delivery history or on the best case. They are the only one who can sequence competing deliverables rather than run them together, build buffer into a schedule rather than assume none is needed, create a route for renegotiating a timeline that does not cost the person who uses it, and keep urgency reserved for what is genuinely urgent so that priority stays distinguishable at all.
The difficulty is that almost nothing an organisation measures points there. Delivery is recorded against the date, not against the assumption the date was built on. Engagement surveys record how people feel about their workload.
Neither records whether the schedule was ever scoped. If the estimate is never examined after the fact, what exactly is being tested when someone misses it?
So the pressure compounds in the one place the individual cannot see and the organisation is not looking, until the person meeting every date quietly stops being able to.
Opinion: The Date Was a Decision. The Failure Is Attributed to a Person.
Our position is that a deadline is a decision about time, taken by someone, and that its accuracy is a property of the process that produced it rather than of the person who inherits it.
That changes what a missed date is evidence of. Not how quickly the person works, but what the estimate was built on, who was in the room when it was made, and whether it has ever been compared with what the work actually took.
What the Eurofound series adds is a separation between two things usually discussed as one. Working time has improved, measurably and over decades. Work intensity has not moved with it.
Whatever was removed from the working day, the expectation of what fits inside it stayed where it was.
That gap matters more now than it did, for a reason specific to time rather than volume. Automation has taken the work that could be done faster and left the work that cannot: the judgement that has to be sat with, the problem that has to be held whole, the answer that has to be noticed as wrong.
None of that compresses. Squeezing the schedule does not make it quicker, it makes it worse, and the loss does not appear anywhere on the delivery date. It appears in the capacity to think, which nothing in the organisation measures.
An organisation that sets dates without scoping them and then reads the overrun as a fact about the person is not simply running late. It is misdiagnosing its own scheduling as a performance problem, and acting on the diagnosis.
The provocation we would leave open is this. Every deadline in a working life was set by someone, at a moment, on the basis of some assumption about the work.
The individual is assessed against the date. The assumption is assessed by nobody. It is worth asking why the estimate is the only part of the arrangement that is never reviewed.
Declaration of Generative AI and AI-assisted technologies in the writing process:
The author made use of Generative AI or AI-assisted technologies in the preparation of this post.
Sources
Eurofound, "European Working Conditions Survey 2024: Overview report," Publications Office of the European Union, Luxembourg, 14 April 2026
Eurofound, "Trends in job quality: EWCS 2024 first findings," indicator level results from the same survey, 3 September 2025
The contents of this article are for informational purposes only and do not constitute professional, legal, or financial advice.

.jpg)
.jpg)
.jpg)
.jpg)